• Traffic Information

     


    Boundary Street lane shifts and new traffic pattern  

    To facilitate lane shifts the median has been closed on Highway 21 Business. Left turns will only be available at the intersections of Palmetto Drive, Hogarth Street, Jean Ribaut Square, Greenlawn Drive and Marsh Drive.  Motorists are urged to use caution while traveling through the area while new traffic patterns are being established. The new speed limit of 35 MPH is being enforced on Highway 21 Business to protect workers in the work zone area. Delays and heavy traffic on Highway 21 Business is expected, motorists should plan accordingly.

    Drivers are urged to use caution throughout the work zone. To help protect workers, the speed limit has been reduced to 35 miles per hour and traffic fines are higher.


    


     

  • Construction Information

     


     

    OAK CREEK DRIVE IN THE TOWN OF PORT ROYAL ROAD REPAIR 

    Please be aware that the Town must temporarily close Oak Creek Drive in Port Royal at the causeway (near 3 Oak Creek Drive) to perform an emergency culvert replacement under the road. Currently there are two large steel plates covering a very large sinkhole spanning across both lanes of traffic. Due to the size and depth of the pipes and the difficulty of water control for this project the entire road must be closed. The Town plans to perform this emergency work starting, January 6, 2017 until the work is complete. The Town will provide a temporary access road from Dillon Road through 11 Oak Creek Drive that will connect to the cul-de-sac on Oak Creek Drive. This temporary road will allow access to the homes on Outpost Lane and Tabby Road. Port Royal will provide the security for this temporary entrance and will notify residents of the road closure. Thank you for your patience and understanding.


    MAY RIVER ROAD IMPROVEMENTS 

    May River Road Improvements Phase 2 streetscape project which consists of approximately 2,800 linear feet roadway improvements along May River Road between Pin Oak Street and Red Cedar Street. These improvements include but are not limited to drainage, grading, curb and gutter, sidewalk, parking, lighting and landscaping.

    Beginning late during the week of 1/3/17 Preferred Materials (PMI) will being installing traffic control devices and safety equipment to delineate our construction areas. PMI will deploy a digital message board device on both the east and west sides of the project area to help keep the public informed of construction activities.

    Please be advised to use caution and expect delays when traveling in these areas.

     Boundary Street lane shifts and new traffic pattern  

    To facilitate lane shifts the median has been closed on Highway 21 Business. Left turns will only be available at the intersections of Palmetto Drive, Hogarth Street, Jean Ribaut Square, Greenlawn Drive and Marsh Drive.  Motorists are urged to use caution while traveling through the area while new traffic patterns are being established. The new speed limit of 35 MPH is being enforced on Highway 21 Business to protect workers in the work zone area. Delays and heavy traffic on Highway 21 Business is expected, motorists should plan accordingly.


     

     

     

     

     


     

     


     

     


     

     

     

     

     

    

     

  • EMD News Report
    No Current EMD News Reports at this time
  • EMD Situation Report
    No Current Situation Reports at this time